My Store
Lawaia 80M Fishing Net Single Layer Gill Net with Long Lead Pendant Nylon Sinking Fishing Trap Network Plastic Float Sticky Net
Lawaia 80M Fishing Net Single Layer Gill Net with Long Lead Pendant Nylon Sinking Fishing Trap Network Plastic Float Sticky Net
Couldn't load pickup availability
SPECIFICATIONS
Brand Name: Lawaia
Origin: Mainland China
Retractable or Not: Yes
Positionable or Not: Yes
With Glueing or Not: No
Length: 80M
Knot Type: Double
Plastic Type: ABS
Product Type: Fishing Nets
Style: Monofilament
Mesh Size: Large Mesh
Type: Gillnet
Lawaia 80M Fishing Net Single Layer Gill Net with Long Lead Pendant Nylon Sinking Fishing Trap Network Plastic Float Sticky Net
Product Features:
Material: green silk thread
Float: plastic float
Sinker: long lead sinker
Layer: single layer
Specification:
Cell size:
2cm/3cm/4cm/5cm/6cm/7cm
Size:
HeightxLength
1.2mx80m
1.5mx80m
2mx80m
Note:
1.Plastic float color may be sent randomly,
due to different production batches.
2.Data obtained by manual measurement,
please allow small deviation.
3.If you need other mesh size,
please contact customer service.
Share




