Skip to product information
1 of 4

My Store

Lawaia 20M Green Silk Fishing Net 3-layer Mesh Gillnet with Long Lead Pendant Network Monofilament Gill Nets Fishing Accessories

Lawaia 20M Green Silk Fishing Net 3-layer Mesh Gillnet with Long Lead Pendant Network Monofilament Gill Nets Fishing Accessories

Regular price $33.34 USD
Regular price $33.34 USD Sale price $33.34 USD
Sale Sold out
Color

SPECIFICATIONS

Brand Name: Lawaia

Retractable or Not: Yes

Origin: Mainland China

Positionable or Not: Yes

Style: Monofilament

Mesh Size: Large Mesh

With Glueing or Not: No

Length: 20m

Knot Type: Double

Plastic Type: ABS

Type: Gillnet

Product Type: Fishing Nets

Lawaia 20M Green Silk Fishing Net 3-layer Mesh Gillnet with Long Lead Pendant Network Monofilament Gill Nets Fishing Accessories


Product Features:

Material: green silk thread


Float: plastic float

Sinker: long lead sinker

Layer:  3-layer





Specification:

Cell size: 2cm/3cm/4cm/5cm/6cm/7cm


Size:

HeightxLength

1.5mx20m





Note:

1.Plastic float color may be sent randomly,

   due to different production batches.

2.Data obtained by manual measurement,

   please allow small deviation.

3.If you need other mesh size,

   please contact customer service.



View full details